Selective Coordination Planning for Aerospace Manufacturing

Selective coordination for aerospace manufacturing requires a facility-wide view of protective-device behavior, operational priorities, and planned electrical changes. This guide outlines the information owners, engineers, and equipment suppliers should align before specifying new equipment.

POWER DISTRIBUTIONBUILT WITH PURPOSE
Electrical switchgear cabinets in an industrial equipment room
Equipment photograph supplied for illustration.
THE DETAILS MATTERMade for the
work ahead.
MADE IN USAAmerican manufacturing
UL 891Switchboard standard reference

UL 891 is a switchboard standard, not a claim of certification. Confirm applicability and listing for each assembly.

01 / PROJECT INPUTS

The right details make the difference.

Start with the requirements that shape your equipment. Share what you know, and identify what needs discussion.

Discuss your project
PROJECT SPECIFICATIONSREFERENCE / 01
Information to share about your switchgear project
DetailWhat to share
EquipmentType of switchgear or distribution equipment needed
ElectricalRequired voltage, current, and fault-duty criteria
ConfigurationInstallation environment, space, and access requirements
DocumentationDrawings, schedules, applicable standards, and desired listings

Requirements and applicable listings depend on the specific project and equipment.

Start with the facility’s operating priorities

Aerospace manufacturing can bring precision production equipment, test systems, environmental controls, and process-support loads together in one electrical distribution system. Their operating consequences differ. A disturbance affecting one machine may be manageable, while loss of a shared support system could interrupt several processes. Selective coordination planning starts by identifying these relationships rather than treating every load as equally critical.

For each area, owners and engineers should identify what must remain available, what can stop safely, and what requires an orderly shutdown or restart. Include planned production changes and temporary operating arrangements where relevant. These priorities help the engineer define the system boundary and coordination objectives; they do not replace fault protection, equipment application requirements, or safety procedures.

What selective coordination means in practice

Selective coordination concerns how protective devices respond to overcurrent conditions at different points in a distribution system. The design goal is for the device nearest a fault to operate before upstream devices, where the applicable requirements and device characteristics permit. The intended result is to limit the portion of the system disconnected by a fault, not to promise uninterrupted production or prevent every outage.

Engineers evaluate time-current behavior across the relevant operating range, using device curves, settings, tolerances, and available system data. Curves that appear separated on a chart may not establish coordination for every condition. The responsible engineer must assess the actual devices and system configuration, including the project’s fault-current assumptions and any limits imposed by equipment ratings or protection requirements.

Balance continuity with protective performance

Coordination choices involve tradeoffs. Adjusting a protective-device setting or selecting a different device can affect how long equipment is exposed to fault current, while a faster response may reduce the time available for downstream devices to clear certain faults. The design team must resolve those competing objectives for the specified system; no single setting strategy suits every aerospace facility or load.

Quality-sensitive production may make the extent and duration of an interruption important, but continuity cannot be pursued at the expense of appropriate protection. Identify loads that share feeders or support systems, and ask how a change to one branch could affect upstream protection. The engineer should document the coordination objective, the assumptions used, and any operating limits or exceptions that facility personnel need to understand.

Plan around phased work and changing loads

A facility may add production lines, revise process equipment, or alter distribution in stages. Each phase can change load demand, system configuration, and the protective-device relationships considered in an earlier study. Before specifying new equipment, share the expected sequence of work and distinguish the initial configuration from planned future arrangements. Ask whether the coordination review must address more than one operating scenario.

Temporary feeds, construction conditions, and later tie-in arrangements also deserve explicit review when they are part of the project. A drawing that shows only the final configuration may not describe the protection needed during intermediate phases. The owner, engineer, contractor, and equipment supplier should agree on which configurations are within scope and who will review changes before they are implemented.

Provide complete information to the equipment supplier

Supplier selection depends on a clear project specification, not the industry label alone. Provide one-line diagrams, the equipment’s intended position in the system, specified voltage class, incoming and outgoing feeder details, and the protective-device information established by the engineer. Include available fault-current data and source details when supplied, along with the project’s required ratings, construction, and applicable standards for confirmation.

Low-voltage switchgear may be one interface in a larger distribution design, but it is not automatically required for every aerospace application. The engineer should determine the equipment form and scope. Where new low-voltage switchgear is specified, its proposed devices and configuration need to align with the project’s coordination assumptions. South Carolina Switchgear Builders manufactures new equipment to specification; final design details, availability, and lead time require project-specific confirmation.

Use a project checklist before release

Before requesting a quotation, align the owner’s continuity priorities with the engineer’s documented protection objectives. Confirm the system boundary, one-line revision, operating scenarios, device data, required ratings, construction details, and any applicable standards. Identify unresolved assumptions instead of allowing them to become hidden design decisions. State whether the request covers an initial phase, a future configuration, or both.

Then establish review responsibilities and submittal expectations. The project team should confirm which party provides coordination analysis, who reviews device settings, and how approved changes will be reflected in drawings and equipment documents. Verify project-specific listing or testing requirements against the actual specification and proposed assembly rather than assuming they apply universally.

Coordinate the handoff through the project lifecycle

Useful coordination planning continues beyond the purchase request. The engineer’s design basis should travel with the equipment information so reviewers can compare the proposed configuration with the intended system. When the design, source data, or operating plan changes, the responsible parties should determine whether the protection review and equipment documentation need revision before release or installation.

For a complete quotation discussion, send the current project documents, identify the decision-makers, and note open technical questions and schedule needs. Qualified personnel must handle installation, testing, and maintenance under applicable safety procedures. With priorities, assumptions, and responsibilities made explicit, aerospace facility teams can evaluate new distribution equipment as part of a coherent protection plan—one that addresses both operational continuity and the need for dependable fault protection.

03 / START A CONVERSATION

Let’s talk about your project.

Tell us what you’re working on and the details you have so far. You can include drawings and other documents in your email.

Prefer to call? (951) 403-5738

Email sales: saleselectricalbuyers@gmail.com

PROJECT INQUIRY01 — 04

* Required fields. This form opens your email application; send the prepared message there, or email us directly. You can also call (951) 403-5738.