Start with the actual operating locations
Water and wastewater systems can include treatment buildings, pump stations, outdoor process areas, and remote installations. Conditions may differ substantially between locations within one project. Before selecting new switchgear, identify where each assembly will be installed and describe the conditions it will encounter during normal operation, seasonal extremes, and foreseeable maintenance. Avoid treating a facility-wide climate description as a substitute for location-specific engineering information.
Map the electrical distribution scope to the process equipment it serves. Identify pumps, blowers, mixers, screens, controls, and other loads, noting which are essential to operation and how they are expected to start and run. This context helps the responsible engineer evaluate the equipment interface and determine what information suppliers need. It also reduces the risk of comparing proposals based on different assumptions about duty, environment, or included components.
Document temperature, humidity, and altitude
Record expected ambient temperature ranges at the intended equipment location, including whether the switchgear room is conditioned, ventilated, or subject to process heat. Describe humidity, condensation potential, and any known temperature cycling. A statement such as “indoors” does not explain whether the room remains dry or experiences moisture. The responsible engineer should establish design assumptions and confirm whether the proposed configuration is suitable for the documented conditions.
Provide the site elevation or altitude when available, and ask the project engineer and equipment supplier to confirm whether it affects the specified design. Do not assume the same environmental assumptions apply to indoor electrical rooms and exposed outdoor installations. If site conditions vary across a project, identify each location separately. Clearly stating known conditions—and flagging information still being verified—supports a more accurate technical review than relying on a generic description.
Assess water, corrosion, and exposure
Describe credible exposure to washdown, splash, leaks, flooding, standing water, dust, chemicals, or corrosive atmospheres. Identify the source, location, and frequency where known; distinguish routine cleaning from accidental exposure or exceptional events. Salt exposure should be documented where it is relevant to the site, not presumed for every water facility. The buyer and engineer should specify the required protection and confirm that the proposed enclosure and installation arrangement address the actual exposure.
Explain whether equipment will be indoors or outdoors and whether nearby processes create moisture, vapor, or chemical exposure. Include known drainage concerns and the intended room or pad arrangement, while leaving site elevation, flood protection, enclosure selection, and other design decisions to qualified project professionals. These details affect the equipment specification and installation planning. They should be reviewed against the complete project requirements rather than inferred from a product name or a broad industry category.
Connect motor starting requirements to distribution
Motor loads are central to many water and wastewater projects, but their operating requirements vary. Provide motor nameplate and load data when available, along with starting method, expected starting frequency, simultaneous-starting assumptions, and any operational sequence established by the controls design. The engineer should evaluate how those loads interact with the proposed distribution system. Do not assume a particular starting approach or electrical rating without project-specific review.
Clarify whether the scope includes medium-voltage switchgear, low-voltage switchboards, or equipment at more than one distribution level. Medium-voltage switchgear may be an interface in some projects; it is not automatically required for every treatment or pumping facility. Confirm system voltage, protective-device requirements, incoming-source details, and coordination responsibilities with the engineer. Provide available project documents and identify unresolved decisions so the manufacturer can respond to a defined, consistent specification.
Plan controls, space, and maintenance access
Identify required connections to motor controls, process automation, alarms, and monitoring systems, including the information each interface is expected to exchange. Share relevant control diagrams, communications requirements, and division of responsibility where available. Suppliers should not have to infer the owner’s control architecture from a general description of the treatment process. The project team should confirm which control functions are part of the switchgear or switchboard scope and which belong to separate equipment.
Provide room dimensions, access routes, equipment arrangement constraints, and known installation restrictions. Consider how qualified personnel will reach operating and service points under the project’s safety procedures, without assuming that a nominal room size guarantees practical access. Include adjacent equipment and planned cable entry or routing information when established. Early coordination among the owner, electrical engineer, controls team, installer, and manufacturer can identify conflicts before the equipment configuration is finalized.
Prepare a useful specification package
A focused request for information should include the one-line diagram, load schedule, system voltage, site location conditions, indoor or outdoor placement, and requested equipment scope. Add motor starting and control information, environmental exposure details, applicable project standards, and any defined enclosure or listing requirements. Mark preliminary values clearly and state who will confirm them. This helps the supplier identify assumptions instead of silently treating incomplete data as settled design criteria.
For new custom equipment, South Carolina Switchgear Builders manufactures to specification, with US-built equipment and all-American components; nationwide shipping is available. Availability and actual lead times depend on the order and must be confirmed. Ask for project-specific confirmation of configuration, ratings, applicable standards, testing, listing, and delivery timing. Any assembly listing or standard applicability must be verified against the actual design and equipment rather than assumed for an entire product category.
Coordinate review before release
Before approving the final submittal, have the owner and responsible engineering professionals review site assumptions, equipment interfaces, motor-load requirements, protective-device information, controls, and physical arrangement. Confirm who will resolve outstanding questions and when the approved documents become the basis for manufacturing. Installation, testing, and maintenance should be performed by qualified personnel following applicable project procedures and safety requirements.
A complete, location-specific record makes the equipment selection process more useful: it connects real environmental conditions to electrical and operational requirements without assigning one assumed rating to every facility. If a condition is unknown, identify it, name the party responsible for confirming it, and keep it open for review. That disciplined handoff gives the project team and manufacturer a clearer basis for specifying new switchgear or switchboards that fit the defined application.